Construction, plumbing and service integrated framework


Download 358.1 Kb.
NameConstruction, plumbing and service integrated framework
page1/20
A typeDocumentation
manual-guide.com > manual > Documentation
  1   2   3   4   5   6   7   8   9   ...   20




CONSTRUCTION, PLUMBING AND SERVICE

INTEGRATED FRAMEWORK

TRAINING PACKAGE

CPC08


CPCPWT3021A


SET OUT AND INSTALL WATER SERVICES









LEARNING GUIDE

ACKNOWLEDGEMENTS


National Plumbing Services Training Advisory Group

Plumbing Industry Commission Victoria
© Commonwealth of Australia 2015
Construction and Property Services Industry Skills Council

PO Box 151

Belconnen ACT 2616

Tel: 02 6253 0002

www.cpsisc.com.au
This work is copyright, but permission is given to trainers and teachers to make copies and contextualise the resources for use within their own training organisation or in a workplace where training is being conducted. This permission does not extend to making copies for use outside the immediate training environment for which they are made, or the making of copies for hire or resale to third parties.

This work was first published in 2004 with the assistance of funding provided by the Commonwealth Government through the Australian National Training Authority (ANTA). The 2015 publication has been updated to reflect changes to the national units of competency.
The views expressed in this work do not necessarily represent the views of the Commonwealth of Australia or CPSISC. In addition, the Commonwealth of Australia and CPSISC do not give warranty or accept any legal liability in relation to the content of this work.

The website addresses and other contact information provided in this publication were compiled in good faith and were correct at the time of printing.
The updating of these resources was completed by:

National Plumbing and Services Training Advisory Group, with funding and support provided by the Construction and Property Services Industry Skills Council (CPSISC):










This guide was developed in consultation with representatives of the Plumbing Industry by NPSTAG and CPSISC to support the implementation of the CPC08 Construction, Plumbing and Services Training Package.

Contents


CONSTRUCTION, PLUMBING AND SERVICE ii

INTEGRATED FRAMEWORK ii

TRAINING PACKAGE ii

CPC08 ii

CPCPWT3021A ii

SET OUT AND INSTALL WATER SERVICES ii

LEARNING GUIDE ii

ACKNOWLEDGEMENTS iii

Contents iv

What is this resource about? 1

How do I use this resource? 1

What do I have to do? 1

Flexible Delivery 1

CPCPWT3021A 2

Set out and install water services 2

Unit Descriptor 2

Element 2

Performance Criteria 2

Required knowledge 3

How will I be assessed? 4

Are there any pre-requisites? 4

What other resources will I need? 5

Texts 5

Web sites 5

Video or audio cassettes 5

Introduction 6

The rough-in 6

Prepare for work 6

Planning 6

Work notices 6

Plans and specifications 7

Quality assurance and WHS 8

Co-operation with others 9

Determine installation requirements 10

Quantity and type of materials 10

Approved materials 10

Materials for water services 11

Copper 11

Insulation 12

Pipe used for Non potable water supply 12

Polyethylene (PE) 12

Cross-linked polyethylene (PE-X) 13


Unplasticised polyvinyl chloride (PVC-U) 14

Chlorinated polyvinyl chloride (CPVC) 14

Polybutylene (PB) 15

Polypropylene (PP-R) 15

Other materials 15

Equivalent pipe sizes 16

Example 16

Example 16

Selection of suitable materials 17

Ordering and checking the delivery 18

Tools and equipment 18

Hand and mechanical excavation equipment 18

Hand and power tools 18

Scaffolding 18

Bending tools 19

Flaring tools and flared joints 19

Crimping tools 20

Silver brazing equipment 21

Tube expanders 22

Branch pullers 22

Crox tool 22

Tube and pipe cutters 23

Elevated work platforms 23

Install and test pipe systems 24

Set out piping and connection points 24

Pipework design 29

Design of Non-Potable systems 29

Sizing pipework 29

Trenches 30

Supports 31

Copper pipes 31

PVC-U, polyethylene, cross-linked polyethylene, polypropylene, polybutylene and CPVC pipes 32

Installation and pipe jointing 32

Pipe joints 33

Valves 33

Gate valves 33

Ball valves 34

Stop taps 34

Pressure limiting valves 35

Tempering valve 36

Non potable valves taps and water meters 37

Copper tubing 37

Manual lifting and handling equipment 38

Testing your installation 38

Testing and commissioning non potable water supply 39

Clean up 40

Name:…………………………………………………………… 41

Worksheet 41

CPCPWT3021A – Set out and install water services 41

Name:…………………………………………………………… 51

Practical application 51

CPCPWT3021A – Set out and install water services 51

Assessment checklist 53

CPCPWT3021A – Set out and install water services 53

Worksheet
53
  1   2   3   4   5   6   7   8   9   ...   20

Share in:

Related:

Construction, plumbing and service integrated framework iconConstruction, plumbing and service

Construction, plumbing and service integrated framework iconConstruction, plumbing and service

Construction, plumbing and service integrated framework iconConstruction, plumbing and service

Construction, plumbing and service integrated framework iconConstruction, plumbing and service

Construction, plumbing and service integrated framework iconOzone Widget Framework for Distributed Common Ground Station Army...

Construction, plumbing and service integrated framework iconIn three systems delivering hot water to food-service and culinary...

Construction, plumbing and service integrated framework iconFlorida Department of Education Curriculum Framework Program Title:...

Construction, plumbing and service integrated framework iconFlorida Department of Education Curriculum Framework Program Title: Marine Service Technologies

Construction, plumbing and service integrated framework iconHow to Select the Right One Plumbing Your Tub About Motors and Pumps

Construction, plumbing and service integrated framework iconMechatronics integrated

Construction, plumbing and service integrated framework iconMechatronics integrated

Construction, plumbing and service integrated framework iconTo request for product service and order replacement parts, please...

Construction, plumbing and service integrated framework iconIntegrated seismic instrumentation system

Construction, plumbing and service integrated framework iconIntegrated circuit cross reference

Construction, plumbing and service integrated framework iconCris / Dragon Integrated Voice Recognition

Construction, plumbing and service integrated framework iconSchool Counseling is an Essential and Fully Integrated Part of the

Construction, plumbing and service integrated framework iconFirst of all create a service account. This Service account should...

Construction, plumbing and service integrated framework iconChapter 1 – Integrated marketing communications and brand equity enhancement

Construction, plumbing and service integrated framework iconInsulated Core Metal Wall Panel System with Integrated Components

Construction, plumbing and service integrated framework iconHydro mpc-e boosterpaQ (Integrated vfd/Motor) Guide Specification




manual


When copying material provide a link © 2017
contacts
manual-guide.com
search