Sno.

Loco No.

Home Railway

Shed

Type of Loco

Loco Class

Date of Commissioning

Manufacturer

Failure Date

Equipment Responsible

Brief details of failure

Action taken

No of days after Commissioning

1

31644

ECoR

WAT

3-Phase

WAG9

28-Dec-16

CLW

29-Dec-16

Transformer

During DGA of TFP oil was abnormal (1) Methane-285.61700,(2)Ethane-4.48660,(3)Ethylene-6.88450 (4) Acetylene-0.00000,(5)Hydrogen-28.76690,(6) CO-331.95200 (7) CO2-1121.1400

Letter send to firm M/s. ABB India Ltd,Bangalore Vide letter no. WAT/TRS/T/32C/10,Dt. 02-01-2016.

1

2

31644

ECoR

WAT

3-Phase

WAG9

28-Dec-16

CLW

29-Dec-16

TM/MR Scavenge motor

During inspection, it is found Heavy abnormal sound. Fail equipment: Scavenger Blower TMB-1, S.No-CF30D2176, Make: SH

Letter to M/s Samal Sharand, Kolkata-700071 and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/3663, Dt. 30-12-2015

1

3

31622

ECoR

WAT

3-Phase

WAG9

20-Jul-16

CLW

28-Dec-16

Switches

BL switch assembly,PCE Make,Sl No. CLW/ES/30074.BL switch assembly internally rotating and stuck-up.

Letter to M/s Patra & Chanda Mfg. & Engg Pvt., HWH-711101 and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/3686, Dt. 28-12-2015

161

4

31645

CR

AQ

3-Phase

WAG9

01-Nov-15

CLW

01-Nov-16

CBC/Draft gear/TSC

1) Cab-1 LP side buffer, hole found in center around 10 mm dia. Make FAS a114, Sr. No. 183.(firm advised)

--

366

5

31622

ECoR

WAT

3-Phase

WAG9

12-Aug-15

CLW

30-Jun-16

Miscellaneous

Cab-1 Air conditioner ON-OFF rotating switch open circuit. Equipment Make: DRI & Name of equipment: Cab-1 AC.

Letter to M/s M/s Daulat Ram Industries, Bhopal – 462 023 and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/1807, Dt. 30-06-2016.

323

6

25025

ECoR

WAT

Conventional

WAP4

03-Aug-15

CLW

28-Jun-16

Miscellaneous

Blower motor MCB tripped 3Phase coupler pins shorted. Make: AMIT, Name of equipment: AC unit & Sl No. AE/CLW/004-J-14.

Letter to M/s Amit Engineers, Himachal Pradesh - 173205 and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/1800, Dt. 30-06-2016.

330

7

31753

ECoR

WAT

3-Phase

WAG9

20-Apr-16

CLW

28-Jun-16

Aux. converter IGBT (BUR)

During Off IA inspection found self-test peripheral I/O failed & Aux. converter-3 (BUR-3) & getting isolated due to CCPA card defective. Name of equipment: CCPU card of BUR-3 (CGL), Sl No: CGA1002161178 & CCPU Card Sl No: 1601531 (defective)

Letter to M/s Crompton Greaves Limited, Bhopal, Madhya Pradesh and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/1799, Dt. 30-06-2016.

69

8

31622

ECoR

WAT

3-Phase

WAG9

10-Aug-15

CLW

26-Jun-16

Traction converter IGBT (SR)

SR2 coolant leakage and not visible in gauge. SR2 coolant leakage from inlet pipe to SR-2 joint. Pipe line was open & checked found pipe is in ovality condition.Name of equipment: SR-2 & Sl no: 233

Letter send to firm M/s. Bharat Heavy Electrical Limited, Bangalore-560026 Vide letter no. WAT/TRS/T/32C/1813,Dt. 01-07-16.

321

9

31724

ECoR

WAT

3-Phase

WAG9

03-May-16

CLW

24-Jun-16

TM/MR Scavenge motor

SCTMB- 2 inductance value is low. Make: Ranjan, Name of equipment: Scavenger blower for TMB-2 & Sl No:15-08-87

Letter to M/s GTR Company Pvt. Ltd.,Kolkata-700 074 and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/1767, Dt. 27-06-2016.

52

10

31722

ECoR

WAT

3-Phase

WAG9

05-May-16

CLW

23-Jun-16

Sensor (FDU, Speed, Pressure, Temp. OHE/ Voltage)

TM-6 temperature sensor resistance valve found AB & CD more than 0.3 ohms, AB 113.20 ohms & CD 69.67 ohms. Make: Trolex, Name of equipment: TM temperature sensor.

Letter send to firm M/s. Trolex India Pvt. Ltd Bangalore, Karnataka Vide letter no. WAT/TRS/T/32C/1770, Dt. 27-06-16.

49

11

31722

ECoR

WAT

3-Phase

WAG9

05-May-16

CLW

23-Jun-16

110V MCB

Make: Ranjan, Name of equipment Scavenger blower for MRB-1 & Sl No: 15-12-202 Fan slack excessive, motor shaft vertical play.

Letter to M/s M/s GTR Company Pvt. Ltd.,Kolkata-700 074 and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/1760, Dt. 25-06-2016.

49

12

31637

ECoR

WAT

3-Phase

WAG9

26-Dec-15

CLW

21-Jun-16

Oil cooler blower unit

During TR inspection, it is found, heavy bearing sound & impeller slack. Make: RP Machine tools, Name of equipment: OCB blower motor & Sl No IC/1507010.

Letter to M/s. RP Machine Tools, Gaziabad-201002 and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/1725, Dt. 23-06-2016.

178

13

31523

ECoR

WAT

3-Phase

WAG9

10-Dec-14

CLW

20-Jun-16

Switches

Equipment Make: PCE Cab-2 BL switch jammed condition.

Letter to M/s.Patra & Chanda mfg. & Engg Pvt. Ltd. Howrah - 711101 for early attention vide lt No. WAT/TRS/T/32C/1723, Dt.22-06-16

558

14

31675

ECoR

WAT

3-Phase

WAG9

31-May-16

CLW

20-Jun-16

Miscellaneous

Name of equipment: Filter discharge contactor arc-chute, Make: Secheron, S. No. B205801R00002GE1375401. Filter discharge contactor arc-chute Obstructing the mobile contact.

Letter to M/s M/s Sécheron (India) Private Ltd. Gurgaon 122002. for early attention vide lt No. WAT/TRS/T/32C/1689, Dt. 20-06-16

20

15

31637

ECoR

WAT

3-Phase

WAG9

26-Dec-15

CLW

17-Jun-16

Aux. converter IGBT (BUR)

Name of equipment:BUR-2,S.No. CGA1002156108 Inverter module S.No.CGA1051560336(defective) During testing, it is found Disturbance in Aux. converter-2 (BUR-2) & getting isolated due to Inverter module defective (one capacitor burst condition).

Letter to M/s.Crompton Greaves Limited Bhopal, Madhya Pradesh for early attention vide lt No. WAT/TRS/T/32C/1752, Dt. 24/06/16.

174

16

31724

ECoR

WAT

3-Phase

WAG9

03-May-16

CLW

16-Jun-16

110V MCB

Machine room blower MCB flashed. Fail equipment: Machine room blower MCB, Type: NG-125HC20A, Make: Schneider

Letter to M/s. Schneider Electrical Infrastructure Ltd., GUJARAT-391510 - for early attention vide lt No. WAT/TRS/T/32C/1680, Dt. 18-06-16

44

17

31577

ECoR

WAT

3-Phase

WAG9

13-Jun-15

CLW

16-Jun-16

Miscellaneous

Battery contactor knob broken. Fail equipment: Battery contactor Type: NS X 100F IEC/EN 60947-2, Make: Schneider

Letter to M/s. Schneider Electrical Infrastructure Ltd., GUJARAT-391510 - for early attention vide lt No. WAT/TRS/T/32C/1681, Dt. 18-06-16

369

18

31623

ECoR

WAT

3-Phase

WAG9

20-Aug-15

CLW

12-Jun-16

Central Electronics

Name of equipment: VCU-2, Sl.No.140160820004, URB 512 ‘Q’slot card Sl No.140162920048 (Defective) Auto brakes are not applying due to URB 512 ‘Q’ slot card defective.

Letter to M/s Bharat Heavy Electrical Limited, Bangalore-560026 for early attention vide lt No. WAT/TRS/T/32C/1692, Dt. 18-06-16

297

19

31623

ECoR

WAT

3-Phase

WAG9

20-Aug-15

CLW

11-Jun-16

Miscellaneous

DC-DC converter output NIL. , Fail equipment : DC-DC Converter, Sl No: 201509231, 110/24v, Sl.No. 15-11-216, Equipment make: M.B. & Co

Letter to M/s M.B. & Co. Howrah-711227 for early attention vide lt No. WAT/TRS/T/32C/1634, Dt. 14-06-16

296

20

31623

ECoR

WAT

3-Phase

WAG9

20-Aug-15

CLW

11-Jun-16

Miscellaneous

Cab-2 Air conditioner blower not working, Fail equipment : CAB AC, Equipment make: Daulat Ram Industries

Letter to M/s Daulat Ram Industries, Bhopal – 462 023 for early attention vide lt No. WAT/TRS/T/32C/1633, Dt. 14-06-16

296

21

31704

ECoR

WAT

3-Phase

WAG9

17-Mar-16

CLW

10-Jun-16

TM/MR Scavenge motor

During IA inspection, it is found SCMRB-1 Heavy abnormal sound, Fail equipment : Machine Room blower, Sl No. MF 42/D 1744, Make: Samal Harand

Letter to M/s. Samal Harand of Indian Pvt., Ltd., Kolkata- 700 071 and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/1605, Dt. 11-06-16

85

22

31666

ECoR

WAT

3-Phase

WAG9

17-Mar-16

CLW

09-Jun-16

TM/MR Scavenge motor

During IA inspection, it is found MRB-1 Fan melted and motor earthed, Fail equipment : Scavenger blower for MRB-1 , Sl.No. 15-12-225, Equipment make: Ranjan

Letter to M/s GTR company Pvt.Ltd., Kolkata-700 074 for early attention vide lt No. WAT/TRS/T/32C/1598, Dt. 10-06-16

84

23

31666

ECoR

WAT

3-Phase

WAG9

17-Mar-16

CLW

09-Jun-16

TM/MR Scavenge motor

During IA inspection, it is found MRB-2 Fan melted and heavy bearing sound, Fail equipment : Scavenger blower for MRB-2 , Sl.No. 15-11-216, Equipment make: Ranjan

Letter to M/s GTR company Pvt.Ltd., Kolkata-700 074 for early attention vide lt No. WAT/TRS/T/32C/1598, Dt. 10-06-16

84

24

31638

ECoR

WAT

3-Phase

WAG9

16-Oct-15

CLW

07-Jun-16

Aux. converter IGBT (BUR)

During testing found, Disturbance in Aux. converter-1 (BUR-1) & getting isolated. On trouble shooting done found INVCC card was defective, Fail equipment : BUR-1 (CGL) BUR-1, INVCC card No. 1601541, Equipment make: CGL

Letter to M/s Crompton Greaves Limited, Bhopal, Madhya Pradesh for early attention vide lt No. WAT/TRS/T/32C/1625, Dt. 13-06-16

235
  1   2   3   4   5   6   7   8   9   ...   179

Share in:

Related:

No of days after Commissioning iconKitiara, of all the days these days are locked in dark and waiting,...

No of days after Commissioning iconClinical commissioning group

No of days after Commissioning iconProfile Instrument Technician (Pre-Commissioning)

No of days after Commissioning iconFor supply, Installation, Testing and Commissioning of 33/11 kv external Electrification

No of days after Commissioning iconSupply installation testing & commissioning of air conditioners at peroorkada factory

No of days after Commissioning iconSub : Tender enquiry for Supply, Installation and Commissioning of...

No of days after Commissioning iconHave Varied Experience of in Project/ Routine Maintenance, Installation,...

No of days after Commissioning iconSenior level managerial assignments a Installation and Commissioning...

No of days after Commissioning iconNinety Days, Same As Cash

No of days after Commissioning iconSupply, Installation, Testing and Commissioning of 2 X 700 tr central...

No of days after Commissioning iconWeek Two Meal Planner 7 days for 2 adults

No of days after Commissioning iconWeek One Meal Planner 7 days for 2 adults

No of days after Commissioning iconWeek Three Meal Planner 7 days for 2 adults

No of days after Commissioning iconThe Days were a clan that mighta lived long

No of days after Commissioning iconOver 5,200 visitors: Arburg Technology Days 2011 sets new record

No of days after Commissioning iconWell here I am again. For some time now I am more calm and relaxed...

No of days after Commissioning icon“It takes eleven days to go from Horeb to Kadesh Barnea by the Mount Seir road.”

No of days after Commissioning iconUser Login Time (local): 12/31/2016 09: 49: 01 (4 days, 4 hours, 21 mins ago)

No of days after Commissioning iconExhibits and specialist presentations shed light on production efficiency at the Technology Days

No of days after Commissioning iconCroatia’s largest shopping centre is opening on 12 November with...




manual


When copying material provide a link © 2017
contacts
manual-guide.com
search