299

31588

ECoR

WAT

3-Phase

WAG9

13-Jan-16

CLW

13-Jan-16

Miscellaneous

During commission, It is checked found, ZBV connection box PCB track and relay over hated. . Fail Equipment: ZBV connection box, Sl No. CB14050149, Make :BTIL

Letter to M/s. M/s. Bombardier Transportation India Ltd, Vadodara-390013 and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/320, Dt. 19-01-16

0

300

31701

SER

TATA

3-Phase

WAG9

27-Dec-15

CLW

13-Jan-16

Traction converter IGBT (SR)

Tr. Converter -II isolate.

Loco checked at BNDM and found traction converter -2 main contactor checked, found it was partially closed caused traction converter-2 isolate. Firm representative attended the contactor and found that gap between the fix & mobile contact was more (42 mm) same adjusted in between the range (23mm to 27mm) and function checked found ok. Details of converter - Make- BHEL( IGBT) , Comm- 27/12/15, EMC make- Knorr Bremse.

17

301

25027

WR

BRC

Conventional

WAP4

20-Jul-15

CLW

11-Jan-16

SIV

As per LP remark, between DRD-GVD, LSCHBA lamp was glowing & VCB tripped with message “VCB tripped via QSIT”. External fault LED was glowing on SIV panel & QSIT target was dropped. QSIT was reset & DJ was closed but DJ tripped again via QSI

the contactor K8 was faulty, Firm representative replaced it with other healthy contactor. After that loco tested and found working normal. Defective Contactor was handed over to firm representative for further detailed investigation at firm premises. Loco will be kept under observation

175

302

25008

ECoR

WAT

Conventional

WAP4

09-Feb-15

CLW

11-Jan-16

SIV

Loco was failed online due to SIV internal fault and Battery voltage is 50 V, Fail equipment: SIV, Sl No: STB07W0906/AC LOCO/SCD, Make: SIEMENS

Letter to M/s. Siemens Ltd.(Siemens Switzerland Ltd),Thane-400601 and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/113, Dt. 12-01-16

336

303

28735

ECoR

ANGL

Conventional

WAG7

22-May-15

CLW

10-Jan-16

SIV

CHBA voltage low first appeared on SIV display. Then SIV became completely dead. Make: Hirect, Sl No-2014H/258/56

Firm representative of M/s Hirect attended the SIV at ASN. 25A HRC fuse in the incoming 110V DC supply circuit from battery to SIV found blown out. A new 25A HRC fuse is replaced by firm.

233

304

31543

CR

AQ

3-Phase

WAG9

29-Jan-15

CLW

09-Jan-16

Central Electronics

AUXILLARY CONVERTER 1 ISOLATED SINCE LIFESIGN MISSING BUR 1 KUC CARD CHANGED BUT SAME TROUBLE THEN AUXILLARY CONVERTER 1 ISOLATE." when provided in CEL-2 BUR-2 lifesign missing msg generated. CEL-1/W slot card def.CH-GH found defective. BT make

Firm BT advised for warranty failure

345

305

31649

CR

AQ

3-Phase

WAG9

09-Jan-16

CLW

09-Jan-16

Traction converter IGBT (SR)

BOGIE-2 + HARMONIC FILTER ISOLATE "LOCO CHECKED BY ABB REPRESENTATIVE AT BIA & FOUND TR. BG-2 OFF WITH FAULT MESSAGE LC1_U1_TOP_IGBT_FAILURE FOUND LC-1 TOP GD CARD DEFECTIVE."

Replacement given by ABB

0

306

31649

CR

AQ

3-Phase

WAG9

09-Jan-16

CLW

09-Jan-16

Miscellaneous

1) Traction converter PEC card defective for life sign missing & BG isolated. Firm ABB advised 2) For SCTM-2 55.1/2 , MCB of 32Amp was found provided instead of 6A QX-3 type. 3) 8.1 contactor of FB panel air pipe line coupler cone found old cracked and came out from 8.1 coupler causing heavy air leakage. 4) TFP-2 p-in pressure sensor & TFP-1 temperature sensor , oil leakage noticed. Same attended 5) Primary vertical clearance of axle box No. 1, 2, 6, 9, 11 & 12 more than permissible limit. 6) Primary lateral clearance of wheel set No. 2 & 4 more than permissible limit.

...

0

307

30090

WR

BRC

3-Phase

WAP5

18-Jan-16

CLW

09-Jan-16

Miscellaneous

1.Pantograph-1 side HPT1 link not proper bent. 2.CP-2 mounting bracket modification. 3.Both CPs intercooler safety plate to be provided. 4.FLG-1;0100 SS-08 AUx.conv.3 off + FLG-1;0012 life sign from BUR-3 missing + FLG-1;0095 SS-03 tr.bogie-2 off + FLG-1;0005 life sign from STB-2 missing + FLG-1;0106 SS-14 cab-2 off. Software awaited from M/s. ABB. 5.Both cab BP/FP safety guard to be provided in aerodynamic type 6.CP1 & 2 safety guard N/P. 7.On display TM-1 & 2 isolate but actually not isolate, Same attended by M/s.ABB. 8.In FB cubical contactor air pipe(rubber pipe) to be replaced with copper pipe. 9.Provision of rain protection plate on pn. panel. 10.Provision of cut out cock in VEUL circuit. 11.Both PTs servo motor Pn.pipe clamping to be done. 12.Lateral clearance A/Box-1=13.6 mm & AB3-11.7mm (Std.-15-20mm) 13.A/B vertical clearance AB5-36.2mm & AB8-36.8mm (Std.27 – 35mm) 14.Loco body to BF vertical clearance BF2 LP side 41.6mm (Std.-30-40mm) 15.Roof ladder bottom fixing clamp not provided 16.BF1 side loco body plate loose.

To be attend.

-9

308

31717

WR

BRC

3-Phase

WAG9

18-Jan-16

CLW

08-Jan-16

Miscellaneous

1.On wheel no 2,3,6,7,8,910,11 strap bolt loose. 2.Loco body to Bogie frame vertical clearance BF-1 LP side 43.1 mm ALP side 44.8 mm BF-2 LP side 51.6 mm ALP side 47.0 mm 3.Loco body to Bogie frame Lateral clearance BF-1 LP side 47.5 mm ALP side 52.2 mm ALP side 60.0 mm 4.Brake block 2,5,8,10,13,17,20 touch with flange 5.Axle box vertical clearance Axle box 1= 40.0 mm, Axle box 2=41.9 mm, Axle box 4= 38.3 mm, Axle box 5= 38.8 mm, Axle box 6= 36.5 mm, Axle box 8= 35.8 mm, Axle box 12= 36.2 mm 6.Axle box lateral clearance Axle box 2= 23.2 mm, Axle box 3= 19.3 mm, Axle box 7= 20.2 mm. 7.Gear case-2 top side oil cap missing. 8.CBC2 retaining & support plate bolt loose. 9.CBC-1&2 locking key not properly. 10.Cattle guard 1&2 two bolt loose. 11.Both SR conservator tank vibrating so additional support to be provided. 12.Both SR power cable rubbing and touching with channel. 13.CP1 type coupler one bolt not properly fitted. 14.Both side BP/FP safety guard to be provided in aerodynamic type. 15.Both cabs Inter cooler safety plate to be provided. 16.Roof ladder bottom fixing clamp to be provided. 17.Provision of rain water protection plate provided. 18.clamping all copper pipe behind cab-1. 19.PT 1&2 servo motor pre pipe to be provided. 20.Both CP safety rope to be provided. 21.Both PT overhauling rubber stopper to be provided. 22.CP1 to be remove for CP-1 type coupler one bolt not proper. 23.CBC-1 draft gear heavy gap.

To be attend.

-10

309

24661

NCR

JHS

Conventional

WAG7

16-Dec-14

BHEL

08-Jan-16

Miscellaneous

Both side AFI not working. Loco placed at ELS/MGS.At ELS/MGS found air flow measuring valve was found defective since its diafram damaged. Same measuring valve overhauled and diafram changed. Last diafram changed on dt. 16.12.14 during AOH

Valve rubber kit is being changed during over hauling.

388

310

30088

WR

BRC

3-Phase

WAP5

16-Dec-15

CLW

08-Jan-16

Miscellaneous

Between KSH-BCH, at neutral section, main power off, VCB inhibited message appeared on screen & Loco was dead. Loco was checked at KONY after coasting & tried to energize again. MCE was made OFF/ON. F0108P2 appeared on DDS. Oil level & spread was checked & OCR was reset. Loco was energized & train work done

Following equipments were checked: • OCR relay was checked on test bench found working normal. Make: AAL, Sr. No. BR14120025, DOC: 01.12.15 • Primary Current transducer was checked, found normal. • Transformer main bushing was checked, No flashing or abnormality was noticed. • VCU-1 ‘L’ slot URB512D15 card was checked on test zig, found working normal. • Transformer Sr. No. 2040946 Type No. WT7500, Make: BHEL, Mfg: 2015 DGA of TFP oil was checked, found normal. At the time of appearance of fault “STB1:0002-Primary current above maximum”, in background data, VCB was off with disturbance & Primary current is shown as 10.74 Amp. Following work was done as a precautionary measure. • OCR (78) relay was changed. • Primary current transducer was changed. • STB1 software was re-downloaded. All concerned equipments & circuit is being checked thoroughly in OCR drop cases

23

311

31605

SER

TATA

3-Phase

WAG9

05-Aug-15

CLW

07-Jan-16

Transformer

Oil leakage from TFP (ABB make) bushing.

TFP removed from loco and checked found TFP top plate gasket damaged condition. Gasket changed by firm. TFP re-fitted and oil leakage checked found normal.

155

312

30089

WR

BRC

3-Phase

WAP5

18-Jan-16

CLW

07-Jan-16

Miscellaneous

1.SR-1 valve set 12/1 changing as oil leakage. (Sr.No.CGP- 0311540698,CGL make)-V/set changed. 2.CP-2 mounting bracket modification. 3.Both CPs inter cooler safety plate not fitted. 4.Yaw damper no.1 base plate uncoupled from loco body.(broken) 5.Both cab BP/FP safety guard to be provided in aerodynamic type 6.Both CPs safety rope N/P. 7.SR1 main bushing rubbing with body. 8.SR valve set No.12/3 oil leakage 9.Both SR drain coc oil leakage. 10.Provision of rain protection plate on pn. panel. 11.Provision of cut out cock in VEUL circuit. 12.Lateral clearance A/Box-4=12.9 mm,AB7-13.00 & AB8-11.2mm (Std.-15-20mm) 13.On W.No.3,8 parking brake jam.

To be attend.

-11

313

30085

WR

BRC

3-Phase

WAP5

12-Jan-16

CLW

06-Jan-16

Miscellaneous

1.Awaiting for BHEL staff as Bogie-1 isolate, harmonic filter current too high, contactor stuck up.(Data sent to M/s.BHEL) 2.Both cab BP/FP safety guard to be provided in aerodynamic type 3.Provision of rain protection plate on pn. panel. 4.Provision of cut out cock in VEUL circuit. 5.Both CPs intercooler safety plate to be provided. 6.Roof ladder bottom fixing clamp not provided 7.MPH 2Nos F/bolt not properly fitted 8.Both CPs safety rope not provided. 9.On W.No.1 & 2 sand pipe nozzle not provided. 10.Both cabs LP side sunvisor glass not provided. 11.G/C2 oil leakage from back side 12.All buffer F/bolt loose 13.CBC1,2 housing bolt loose & locking key not proper. 14.CBC2 retaining plate bolt loose. 15.CBC1 excess open after lock condition. 16.Lateral clearance A/Box-4=14.2 mm (Std.-15-20mm) 17.A/B vertical clearance AB1-40mm & AB8-37mm (Std.27 – 35mm) 18.Loco body to BF vertical clearance BF1 LP side 48.4mm & ALP side 41.00mm (Std.-30-40mm) 19.All traction link housing inner & outer retaining bolts are not sealed. 20.SR-1 conservator tank one no pipe oil noticed.

To be attend.

-6

314

30081

WR

BRC

3-Phase

WAP5

31-May-15

CLW

06-Jan-16

Display Unit

Key pad "Enter" key not working

Driver display of M/s ARC changed.

220

315

31660

ECR

GMO

3-Phase

WAG9

23-Sep-15

CLW

06-Jan-16

Pn. Pipe line

Air flow gauge glass cracked . Equip./ Make - Mid Land (Knorr).

Another gauge glass fitted.

105

316

31660

ECR

GMO

3-Phase

WAG9

23-Sep-15

CLW

06-Jan-16

Pn. Pipe line

BC gauge of Bg-1 showing 300gm reading error. Equip./ Make - Midland (KNORR).

Another gauge from section fitted.

105

317

31562

SER
1   ...   10   11   12   13   14   15   16   17   ...   179

Related:

No of days after Commissioning iconKitiara, of all the days these days are locked in dark and waiting,...

No of days after Commissioning iconClinical commissioning group

No of days after Commissioning iconProfile Instrument Technician (Pre-Commissioning)

No of days after Commissioning iconFor supply, Installation, Testing and Commissioning of 33/11 kv external Electrification

No of days after Commissioning iconSupply installation testing & commissioning of air conditioners at peroorkada factory

No of days after Commissioning iconSub : Tender enquiry for Supply, Installation and Commissioning of...

No of days after Commissioning iconHave Varied Experience of in Project/ Routine Maintenance, Installation,...

No of days after Commissioning iconSenior level managerial assignments a Installation and Commissioning...

No of days after Commissioning iconNinety Days, Same As Cash

No of days after Commissioning iconSupply, Installation, Testing and Commissioning of 2 X 700 tr central...

No of days after Commissioning iconWeek Two Meal Planner 7 days for 2 adults

No of days after Commissioning iconWeek One Meal Planner 7 days for 2 adults

No of days after Commissioning iconWeek Three Meal Planner 7 days for 2 adults

No of days after Commissioning iconThe Days were a clan that mighta lived long

No of days after Commissioning iconOver 5,200 visitors: Arburg Technology Days 2011 sets new record

No of days after Commissioning iconWell here I am again. For some time now I am more calm and relaxed...

No of days after Commissioning icon“It takes eleven days to go from Horeb to Kadesh Barnea by the Mount Seir road.”

No of days after Commissioning iconUser Login Time (local): 12/31/2016 09: 49: 01 (4 days, 4 hours, 21 mins ago)

No of days after Commissioning iconExhibits and specialist presentations shed light on production efficiency at the Technology Days

No of days after Commissioning iconCroatia’s largest shopping centre is opening on 12 November with...




manual


When copying material provide a link © 2017
contacts
manual-guide.com
search