To be attend.

368

74

31753

ECoR

WAT

3-Phase

WAG9

20-Apr-16

CLW

25-Apr-16

Miscellaneous

Contactor (52/5) coil short circuit. Fail equipment : Oil cooking blower contactor (52/5), Make: Schneider, S.No. 3R1447506

Letter to M/s. Schneider Electrical Infrastructure ltd. Vadodara -391510 for early attention vide lt No. WAT/TRS/T/32C/1180, Dt. 28-04-16

5

75

31501

ECoR

WAT

3-Phase

WAG9

04-Jul-14

CLW

25-Apr-16

TM/MR Scavenge motor

During IA inspection , It is found scavenger blower for TMB-2 heavy bearing sound. Fail equipment :scavenger blower for TMB-2 , Make: Samal Harand, S.No. CF30/D1712

Letter to M/s. Samal Harand of India Pvt.Ltd, Kolkata-700 071 for early attention vide lt No. WAT/TRS/T/32C/1182, Dt. 28-04-16

661

76

25014

WR

BRC

Conventional

WAP4

26-Apr-15

CLW

20-Apr-16

Miscellaneous

1) Both cab add BP coc without vent type. 2) MR safety valve isolating coc with stainer not provided 3) MR-3 drain coc to be made dummy. 4) MR-3 both side air pipe safety clamp not provided. 5) MCP-1 delivery pipe touch with X’mer body. 6) VEUL coc to be provided with out vent type 7) RGCP pn circuit to be provided with MR-2 8) Pn panel top support not provided. 9) BP charging pn pipe ¾” to be provided. 10) RS tank extra support not provided. 11) VCB NR valve not provided. 12) Roof bar joint connection with nut bolt already existing spring type. 13) Servo motor pn pipe clamp to be done. 14) BV box inlet or outlet cooper pipe not secured. 15) Master NR calve not provided. 16) Both horn cover base not provided. 17) Roof lader bottom fixing plate not provided, 18) PRV ‘C’ clamp not provided. 19) ZSMGR to PHGR & ZSMGR to SMGR pipe rubbing & hanging without clamp. 20) SMGR MG coil is loose, 21) All line contactor to be change. 22) ZSMGR panel add support not provided. 23) HAD switch & fuse not provided. 24) VCB bottom rubber pipe support & clamp not provided. 25) All CTF&J-1,J2 tightness to be maintain. 26) Both HT compartment support not available. 27) Both RSI support not provided. 28) BV box existing shunt open. 29) ET1 & ET2 shunt not proper fitted. 30) BOTH RSI support missing. 31) VCB bottom rubber pipe support & clamp not provided. 32) BV box copper pipe safety clamp not provided. 33) Buffer CBC height to be check. 34) Wheel clearance W/Set 1= 13.8 mm, W/set-3 = 13.9mm, W/Set-4= 13.7 mm, W/set-6=14.6 mm 35) G/C 1,2,3,4,6 gap notice. 36) All step assembly siling missing. 37) Both cab maindoor raining water drain hole. 38) B/F-1 tunion unmodified. 39) All sand box rain protection cover not provided. 40) Gap assembly touching with bucket on W no 12-2-1-3-9-11. 41) Gap assembly inside gap in w no 8-10-11-12-1-5 42) CBC-2 draft gear more gap. 43) Brake Block 15-,22,7 touching flange. 44) All tunion nut welded & spit pin modified to be due. 45) All axle box greasing nipple welded notice. 46) a7,a8 terminal palm clamp bolt broken. 47) S51.S52,S53,S62 & S63 contactor gap to be maintain. 48) MPH drain plug locking. 49) S51.S52,S62,S64 top side foundation bolt proper not fitted & washer gap to be maintain. 50) Conservator tank 3 way cock unsealed. 51) a0 capacitor wire not secured 52) Both cab HT compartment support not provided. 53) Buffer & CBC height more H-1=1112,H2=1125,H3=1078,H4=1080 CBC-1= 1145 & CBC2=1105.

To be attend.

360

77

31647

WR

BRC

3-Phase

WAG9

26-Dec-15

CLW

20-Apr-16

Aux. converter IGBT (BUR)

Main power got off. On checking auxiliary converter 1,2 & 3 found isolated repeateedly on line.

CGL representative changed all KUC cards & CCINV cards of BUR 1, 2,3. Loco is under observation.

116

78

31708

ECoR

WAT

3-Phase

WAG9

02-Apr-16

CLW

20-Apr-16

Sensor (FDU, Speed, Pressure, Temp. OHE/ Voltage)

TM temperature sensor not working element cable cut. Equipment Make: Trolex, Equipment: TM temperature sensor

Letter to M/s Trolex India Pvt. Ltd., Bangalore, Karnataka and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/1008, Dt. 05-04-2016.

18

79

31722

ECoR

WAT

3-Phase

WAG9

18-Apr-16

CLW

18-Apr-16

Brake system (E-70/Knorr)

Power supply card not working (15 Volts lamp blink, dim glowing & BP not creating) Fail equipment : Pneumatic panel poer supply card (E70 brake system), Make: Falvely

Letter to M/s. Faiveley Transport Rail Technologies India Limited, TAMILNADU for early attention vide lt No. WAT/TRS/T/32C/1132, Dt. 22-04-16

0

80

24680

WR

BL

Conventional

WAG7

06-Nov-13

BHEL

17-Apr-16

Traction Motor

QOP-2 DROP, RSI-2 ISOLATE, HQOP-2 ''OFF''. TM-5 ARMATURE BURN BEHIND COMMUTATOR RISER (BBCR). MATERIAL FAILURE (BHEL)

 

893

81

31722

ECoR

WAT

3-Phase

WAG9

16-Apr-16

CLW

16-Apr-16

Miscellaneous

During IC-0 inspection found that TM blower Contactor, 01 No. contactor flashed. Fail equipment: Contactor, S.No. 18730IEL609472, Make: Schneider

Letter to M/s. Schneider Electrical Infrastructure Ltd., GUJARAT-391510 - for early attention vide lt No. WAT/TRS/T/32C/1092, Dt. 19-04-16

0

82

30093

WR

BRC

3-Phase

WAP5

15-Apr-16

CLW

15-Apr-16

Traction motor blower

TMB-1 foundation welding not proper & abnormal sound.

 

0

83

30093

WR

BRC

3-Phase

WAP5

23-Apr-16

CLW

15-Apr-16

Miscellaneous

1.Both cab BP/FP safety guard to be provided in aerodynamic type. 2.Both CP inter cooler S/plate to be provided. 3.Clamping of all coper pipe behind cab-1. 4.PT 1&2 S/motor pn pipe to be clamped. 5.Roof loader bottom in fixing clamp to be provided. 6.Provision of cock in VEUL circuit,. 7.Provision of rain water protection plate on pn panel. 8.Both CP safety wire rope to be provided 9.All BC outer brake liner without split pin 10.CBC1&2 draft gear gap. 11.CBC-1 housing bolt loose. 12.CBC-1 housing both side gap bottom side. 13.CBC 1 R/R plate & supporting plate bolt loose. 14.Cab-1 LP side rail guard bend. 15.CBC 1-2 excess open after lock condition. 16.Both SR power cable rubbing with body. 17.Both SR main contactor power cable lug without sleeve 18.IN FB cubical contactor PVC pipe remove copper pipe to be provided. 19.In FB panel power cable rubbing with pre plate. 20.Both conservator tank add support to be provided. 21.SR-1 terminal no TFU3 rubbing with terminal X11. 22.SR2 terminal cable rubbing with X’mer . 23.Both SR conservator tank to SR hose pipe bend. 24.Both SR conservator tank oil pipe without clamp.

To be attend.

-8

84

28659

NCR

JHS

Conventional

WAG7

21-Mar-16

CLW

14-Apr-16

HT/LT cable

QOP-2 drop and smoke emmission from HTC-2. Checked by LI/DHN & maintenance staff and found same. Hence loco came in shed as dead.

At ELS/JHS found H.T cable (240 mm2) no. H02 AB, CD was over heated & its cable insulation effected due to loose connection at RSI-2 also cable insulation burnt at other end (BA-2 panel) and some LT cable insulation burnt at BA panel.

24

85

28722

NCR

JHS

Conventional

WAG7

27-Jan-15

CLW

13-Apr-16

ESMON

DLI end SPM not working. Loco placed at MGS old shed .Loco checked at MGS/TI shed and found CAB-2 SPM not working due to indicator unit defective since supply card burnt. Same unit changed & unit sent to MGS/TI shed from ELS/JHS with staff. Make Lacvin's. Comm. dt. 27.01.15

 

442

86

31513

ECoR

WAT

3-Phase

WAG9

19-Oct-14

CLW

13-Apr-16

Sensor (FDU, Speed, Pressure, Temp. OHE/ Voltage)

TM temperature sensor resistance value AB & CD is more than 0.3 Ohms (AB-113.27 & CD-136 Mega Ohms). Fail equipment : TM temperature sensor, Make: Florican

Letter to M/s Florican Enterprise, Bhopal-462039 and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/1100, Dt. 18-04-16

542

87

31677

ECoR

WAT

3-Phase

WAG9

08-Apr-16

CLW

12-Apr-16

Miscellaneous

Contactor 52.5/1 deective. Fail equipment: Contactor 52.5/1, S.No. LC1F150, Make: Schneider

Letter to M/s. Schneider Electrical Infrastructure Ltd., GUJARAT-391510 - for early attention vide lt No. WAT/TRS/T/32C/1045, Dt. 13-04-16

4

88

31513

ECoR

WAT

3-Phase

WAG9

19-Oct-14

CLW

12-Apr-16

TM/MR Scavenge motor

1) SCTMB1 was Bearing sound. Fail equipment : Scavenger Blower TMB, S.No.CF25/D/1551, Make: Samal Harand

Letter to M/s. Samal Harand of Indian Pvt., Ltd., Kolkata- 700 071 for early attention vide lt No. WAT/TRS/T/32C/1103, Dt. 20-04-16

541

89

31513

ECoR

WAT

3-Phase

WAG9

19-Oct-14

CLW

12-Apr-16

TM/MR Scavenge motor

1) SCMRB2 was Bearing sound. Fail equipment : Scavenger Blower MRB, S. No. CF25/D/1585, Make: Samal Harand

Letter to M/s. Samal Harand of Indian Pvt., Ltd., Kolkata- 700 071 for early attention vide lt No. WAT/TRS/T/32C/1103, Dt. 20-04-16

541

90

31527

ECoR

WAT

3-Phase

WAG9

21-Nov-14

CLW

11-Apr-16

Miscellaneous

Air flow indicator gauge glass broken & air leakage. fail equipment : Air flow indicator gauge, Sl No. Sl No: F11007, Make: Faiveley

Letter to M/s. Faiveley Transport Rail Technologies India Limited, TAMILNADU and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/1032, Dt. 12-04-16

507

91

28719

NCR

JHS

Conventional

WAG7

27-Jan-15

CLW

11-Apr-16

Bogie & its Mech. equip.

W/No 9,10,11,12 skidded.Loco was jointly checked at GZB and found piston storke was even. Same piston stroke adjusted and loco given ready.

 

440

92

30099

WR

BRC

3-Phase

WAP7

11-Apr-16

CLW

11-Apr-16

Sensor (FDU, Speed, Pressure, Temp. OHE/ Voltage)

TM 3 speed sensor not porperly fitted

same replaced

0

93

31687

WR

BRC

3-Phase

WAG9

15-Feb-16

CLW

10-Apr-16

Traction converter IGBT (SR)

VCB did not close, on checking BT make IGBT module found burst in SR2.

same replaced

55

94

30088

WR

BRC

3-Phase

WAP5

16-Dec-15

CLW

09-Apr-16

Traction converter GTO (SR)

At BCT station fault messages F0201P1 and F1601P2 disturbance in traction converter1 appeared on screen and bogie 1 was OFF. On arrival DDS was taken & following messages were found logged. 4/9/2016 11:20 ASC1:0012-PS fault storage GBC 4/9/2016 11:21 ASC1:0010-Error PS hardware 4/9/2016 11:21 FLG1:0094-SS02 traction bogie1 off Node was checked found 130A On further checking, It was found that from SR-1 GUSP to gate unit 228/5 X2 terminal, cable no. 2665 was not passing feed sometimes.
1   2   3   4   5   6   7   8   9   ...   179

Related:

No of days after Commissioning iconKitiara, of all the days these days are locked in dark and waiting,...

No of days after Commissioning iconClinical commissioning group

No of days after Commissioning iconProfile Instrument Technician (Pre-Commissioning)

No of days after Commissioning iconFor supply, Installation, Testing and Commissioning of 33/11 kv external Electrification

No of days after Commissioning iconSupply installation testing & commissioning of air conditioners at peroorkada factory

No of days after Commissioning iconSub : Tender enquiry for Supply, Installation and Commissioning of...

No of days after Commissioning iconHave Varied Experience of in Project/ Routine Maintenance, Installation,...

No of days after Commissioning iconSenior level managerial assignments a Installation and Commissioning...

No of days after Commissioning iconNinety Days, Same As Cash

No of days after Commissioning iconSupply, Installation, Testing and Commissioning of 2 X 700 tr central...

No of days after Commissioning iconWeek Two Meal Planner 7 days for 2 adults

No of days after Commissioning iconWeek One Meal Planner 7 days for 2 adults

No of days after Commissioning iconWeek Three Meal Planner 7 days for 2 adults

No of days after Commissioning iconThe Days were a clan that mighta lived long

No of days after Commissioning iconOver 5,200 visitors: Arburg Technology Days 2011 sets new record

No of days after Commissioning iconWell here I am again. For some time now I am more calm and relaxed...

No of days after Commissioning icon“It takes eleven days to go from Horeb to Kadesh Barnea by the Mount Seir road.”

No of days after Commissioning iconUser Login Time (local): 12/31/2016 09: 49: 01 (4 days, 4 hours, 21 mins ago)

No of days after Commissioning iconExhibits and specialist presentations shed light on production efficiency at the Technology Days

No of days after Commissioning iconCroatia’s largest shopping centre is opening on 12 November with...




manual


When copying material provide a link © 2017
contacts
manual-guide.com
search