406

143

31703

ECoR

WAT

3-Phase

WAG9

22-Mar-16

CLW

22-Mar-16

Transformer

During IC-0 inspection, DGA of TFP oil was abnormal. fail equipment: TFP, Equipment_ No. AAH-036, Equipment make: ABB

Letter send to firm M/s. ABB India Ltd,Bangalore and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/922, Dt. 26-03-16

0

144

24674

NCR

JHS

Conventional

WAG7

15-May-15

BHEL

22-Mar-16

Control Circuit

MCPs not working sometimes. At trip shed /BSL on 22.03.16 found BLCP-2 stuck up sometimes. Same attended (oiling done) on position by ELS/BSL staff.

 

312

145

31703

ECoR

WAT

3-Phase

WAG9

22-Mar-16

CLW

22-Mar-16

Battery/battery box.

During commissioing All 26 battery cells specific gravity is low I,e Min.1120 and Max 1150 , which is below permissible limits. Fail equipment : Ni-Cd battery, Mgd. Aug-2015, Make: HBL power system

Letter to M/s. HBL Power System Ltd. Hyderabad-500014 and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/961, Dt. 04-04-16

0

146

31585

ECR

GMO

3-Phase

WAG9

03-Sep-15

CLW

21-Mar-16

Aux. converter IGBT (BUR)

BUR-3 Inverter controller card defective.

Inverter controller card changed.

200

147

31585

ECR

GMO

3-Phase

WAG9

03-Sep-15

CLW

21-Mar-16

Traction motor

Oil ingress in TM.

CLW design defect

200

148

31519

ECR

GMO

3-Phase

WAG9

11-Apr-15

CLW

20-Mar-16

TM/MR Scavenge motor

MCB tripped when DJ closed. All phase winding inter turn short. Equip./ Make - SH

MRS-1 changed.

344

149

30090

WR

BRC

3-Phase

WAP5

18-Jan-16

CLW

19-Mar-16

Transformer

Oil was noticed on transformer main tank cover flange bolt. heavy oil was noticed on transformer terminal bushing plate below SR-2.oil was leaking from bolts of transformer terminal bushing plate on date 27.03.16

Transformer was removed from loco & sent to firm on date 30.03.16, presently lying in firm. Spare transformer was provided on loco. Detailed investigation report is awaited from M/s ABB.

61

150

24670

NCR

JHS

Conventional

WAG7

07-Feb-15

BHEL

18-Mar-16

Battery

MCPA not working since BA voltage '0' .At ELS/JHS on 20.03.16 & found battery No-5 defective since open on load. Battery changed. MCPA found normal. Make Jambo, Lug date. 04/2010, DOC-03/2012., Sr. No. 04100678, Mfg year 04/2010

Specifie gravity is being checked in every major and minor sch.

405

151

31695

WR

BRC

3-Phase

WAG9

26-Mar-16

CLW

18-Mar-16

Miscellaneous

1.In FB panel plastic air pipe remove & copper pipe provided. 2.Air dryer final filter out let side joint air level cab-1 working EP valve no 32 ciol picks up condition disk brake not working properly. 3.Buffer & CBC height H1=1108,H2=1115,H3=1103, H4=1086, CBC1=1120,CBC2=1105 4.Axle box vertical clearance Axle box 1= 37.8 mm, Axle box 2= 38.3 mm, Axle box 3= 36.6 mm, Axle box 4= 36.0 mm, Axle box 5= 37.4 mm, Axle box 6= 38.2 mm, Axle box 7= 35.5 mm, Axle box 8= 36.0 mm, Axle box 11= 37.9 mm 5.Axle box Lateral clearance Axle box 1= 24.4 mm, Axle box 2= 21.7 mm, Axle box 4= 19.9 mm, Axle box 6= 24.9 mm, Axle box 7= 19.7 mm, Axle box 8= 19.6 mm. 6.Loco body to bogie frame Lateral clearance Bogie frame 1 LP side 58.5 mm, ALP side 43.0 mm, Bogie frame 2 ALP side 58.5 mm 7.CBC 1&2 draft gear more gap. 8.Rail guard no-2 bend. 9.Brake block 5,9,16,17,19,20&21 touching with flange. 10.Buffer no-3 nyles nut not fitted properly. 11.Axle box 10&12 both side spring rubbing with axle box body. 12.Cab 1&2 driving desk bottom side foundation vibrate 13.Cab-2 LP side dr. chair defective.

To be attend.

-8

152

31702

WR

BRC

3-Phase

WAG9

21-Mar-16

CLW

14-Mar-16

Miscellaneous

1.Both side BP/Fp safety guard to be provided in aerodynamic type. 2.Both CP inter cooler safety plate to be provided. 3.Clamp of all copper pipe to be done behind cab- 4.PT-1 & PT-2 Servo motor pn pipe to be clamp. 5.Provision of rain water protection plate on pn.pipe. 6.Provision of cock in VEUL circuit. 7.Both panto over traveling rubber stopper to be provided. 8.Both SR CT no AK07,AK05,AK06 cable rubbing bottom side to SR body. 9.Both SR power cable rubbing to transformer terminal X11&X21. 10.Both SR bus bar no B721 cable missing. 11.Air dryer final filter not fitted properly. 12.CP-1 taking 7 ½ mm time to build up pre from 0 o 10. 13.CBC height CBC1=1100,CBC2=1108. 14.Axle box Vertical clearance Axle box -1 =39.5 mm, Axle box -2 =37.0 mm, Axle box -4 =26.8 mm. Axle box -5 =37.6 mm. Axle box -6 =36.0 mm. Axle box -8 =36.0 mm. Axle box -12 =46.0 mm. 15.Axle box Lateral clearance Axle box -1 =25.0 mm, Axle box -2 =25.0 mm, Axle box -3 =25.4 mm Axle box -4 =21.0 mm. Axle box -6 =20.4 mm. Axle box -7 =21.3 mm. Axle box -8 =21.0 mm. Axle box -10 =25.0 mm. Axle box -11 =20.0 mm Axle box -12 =22.0 mm 16.Loco body to bogie frame lateral clearance bogie frame 2 ALP side 40.7 mm LP side=52.0 mm. 17.Buffer no 1,3&4 foundation loose. 18.CBC1&2 housing bolt loose. 19.CBC-2 R/R plate bolt loose 20.Wheel no 8&9 lever sealing not proper. 21.Axle box 10 & 11 axle link washer loose. 22.Brake block 8 touching with flange. 23.CBC-1 excess open after lock. 24.Loco body to bogie frame lateral clearance Cab-1 ALP side 42.0 mm LP side=55.0 mm.

To be attend.

-7

153

31626

ECoR

WAT

3-Phase

WAG9

07-Oct-15

CLW

14-Mar-16

Central Electronics

VDuring IB inspection fault data not displayed in driver disply & data not stored in DIA card. Fail equipment: VCU-2, make: BTIL, Sl No. 870, PPB 624 A01, card S.No. 1504269 (U- Slot card, make CGL)

Letter to M/s. BTIL, Vadodara -390013 and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/830, Dt. 16-03-16

159

154

28756

WR

BL

Conventional

WAG7

04-Aug-15

CLW

14-Mar-16

ESMON

BOTH SPM NOT WORKING. IN SPM GLASS FUSE OF 2 AMP WAS MELT. MATERIAL FAILURE, UNDER WARRANTY (AAL).

FIRM INFORMED

223

155

31674

NR

LDH

3-Phase

WAG9

12-Feb-16

CLW

13-Mar-16

Roof equipment

Panto mounting insulator flashed and chipped.Serial no-H/S0330052.M/s Insulators and Electricals Company

 

30

156

31674

NR

GZB

3-Phase

WAG9

12-Feb-16

CLW

13-Mar-16

Aux. converter GTO (BUR)

BUR-2 power supply card defective. LED showing out BUR s of service. BUR serial no-CGA1002159139, M/s CGL

 

30

157

31674

NR

LDH

3-Phase

WAG9

12-Feb-16

CLW

13-Mar-16

Axle box with Bearing

Panto mounting insulator flashed and chipped.Serial no-H/S0330052.M/s Insulators and Electricals Company

 

30

158

31674

NR

LDH

3-Phase

WAG9

12-Feb-16

CLW

11-Mar-16

Memotel (3PH)

Both ESMON not working

ESMON 50 pin coupler pin wire burnt

28

159

31566

ECoR

WAT

3-Phase

WAG9

13-May-15

CLW

10-Mar-16

Sensor (FDU, Speed, Pressure, Temp. OHE/ Voltage)

TM temperature sensor not working due to resitance of AB & CB is more than 0.3 ohms (AB 112.60 ohms & CD 113.90 ohms)Equipment make: Trolex, Name: TM temperature sensor

Letter to M/s Trolex India Pvt. Ltd. Bangalore, Karnataka and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/841, Dt. 18-03-2016.

302

160

31566

ECoR

WAT

3-Phase

WAG9

13-May-15

CLW

10-Mar-16

Bogie & its Mech. equip.

The welding of bogie lug (Modified) for Traction motor no.3 was found crack, fail equipment: Bogie, Equipment_ No. VS-324, Equipment make: Ved Sassomeccanica

Letter to M/s. Ved Sassomeccanica(I) Pvt Ltd., Kanpur -208022 and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/744, Dt. 10-03-16

302

161

31550

ECoR

WAT

3-Phase

WAG9

22-May-15

CLW

09-Mar-16

Miscellaneous

Fire detection unit is not working. Make: Trolex, Name of equipment: Fire detection unit, Sl. No 8641, Mfg: 06-2014 & Voltage rating : 24 V DC.

Letter to M/s Trolex India Pvt. Ltd, Bangalore, Karnataka and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/827, Dt. 16-03-2016.

292

162

31666

ECoR

WAT

3-Phase

WAG9

01-Mar-16

CLW

09-Mar-16

Pantograph

Equipment Make: PCE, Equipment: Panto air supply isolating cock Sl No. 82/8/14. Panto air supply isolating cock not working at 1800 position.

Letter to M/s Patra & Chanda MFG. & Engg Pvt. Ltd.Howrah - 711101 for early attention vide lt No. WAT/TRS/T/32C/735, Dt. 09-03-16

8

163

24669

NCR

JHS

Conventional

WAG7

19-Jan-15

BHEL

09-Mar-16

Auxiliary Motor

CP-1 isolate due to smoke.Loco checked in shed on dt. 19.03.16 & found inter cooler fins overheated due to HP valve defective. Same CP-1 changed. Make Elgi

1. CP's working is being checked in every Major & minor sch. 2. Safety valves are being overhauled in every IC and major schedule. 3. All CP's delivery pipe gasket is being changed 100% in every major sch.

415

164

31596

ECR

GMO

3-Phase

WAG9

08-Aug-15

CLW

09-Mar-16

Oil cooler blower unit

OCB-1 bonded. All phase earthed. Equip./ Make - DRI

OCB-1 changed.

214

165

31704

ECoR

WAT

3-Phase

WAG9

08-Mar-16

CLW

08-Mar-16

Central Electronics

During commissioning, Life sign missing from HBB-1. Fail equipment: VCU-1, make: BTIL, Sl No. 663 KUB921 A01 Card No:K51A104 CD slot

Letter to M/s. BTIL, Vadodara -390013 and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/830, Dt. 16-03-16

0

166

31498

ECoR

WAT
1   2   3   4   5   6   7   8   9   10   ...   179

Related:

No of days after Commissioning iconKitiara, of all the days these days are locked in dark and waiting,...

No of days after Commissioning iconClinical commissioning group

No of days after Commissioning iconProfile Instrument Technician (Pre-Commissioning)

No of days after Commissioning iconFor supply, Installation, Testing and Commissioning of 33/11 kv external Electrification

No of days after Commissioning iconSupply installation testing & commissioning of air conditioners at peroorkada factory

No of days after Commissioning iconSub : Tender enquiry for Supply, Installation and Commissioning of...

No of days after Commissioning iconHave Varied Experience of in Project/ Routine Maintenance, Installation,...

No of days after Commissioning iconSenior level managerial assignments a Installation and Commissioning...

No of days after Commissioning iconNinety Days, Same As Cash

No of days after Commissioning iconSupply, Installation, Testing and Commissioning of 2 X 700 tr central...

No of days after Commissioning iconWeek Two Meal Planner 7 days for 2 adults

No of days after Commissioning iconWeek One Meal Planner 7 days for 2 adults

No of days after Commissioning iconWeek Three Meal Planner 7 days for 2 adults

No of days after Commissioning iconThe Days were a clan that mighta lived long

No of days after Commissioning iconOver 5,200 visitors: Arburg Technology Days 2011 sets new record

No of days after Commissioning iconWell here I am again. For some time now I am more calm and relaxed...

No of days after Commissioning icon“It takes eleven days to go from Horeb to Kadesh Barnea by the Mount Seir road.”

No of days after Commissioning iconUser Login Time (local): 12/31/2016 09: 49: 01 (4 days, 4 hours, 21 mins ago)

No of days after Commissioning iconExhibits and specialist presentations shed light on production efficiency at the Technology Days

No of days after Commissioning iconCroatia’s largest shopping centre is opening on 12 November with...




manual


When copying material provide a link © 2017
contacts
manual-guide.com
search