352

189

30094

WR

BRC

3-Phase

WAP5

01-Jan-16

CLW

29-Feb-16

Traction converter IGBT (SR)

LP noticed that fault message F0504P2 and Bogie2, MC2 isolate. DDS data was checked and following fault messages were logged.- MC2 over current MC2 bg-2 got isolate

ABB engineer checked the loco and provided modified software in both traction convertors (ABB IGBT) for MC over current problem. Loco was checked in shed, found normal and after thorough testing; loco was released on line for passenger services.

59

190

24667

NCR

JHS

Conventional

WAG7

20-Jan-15

BHEL

29-Feb-16

Miscellaneous

Train arrived PSA Yd/R-6 at 13.45hrs. LP taken over charge and planned to attach the loco on AWB/BCN to work in UP direction from PSA. While performing shunting LP experienced DJ tripping with heavy flashing. On checking found relay QLM dropped alone

At ELS/JHS on 12.03.16 checked all parameter of QLM drop and found normal. QLM CT also found ok. Loco kept under observation for 2 days in shunting found normal. So given for service on 14.03.16. Further no trouble reported from line. DGA of GR & TFP checked found ok. BDV=50 KV. QLM setting checked on test panel & found normal (9.0 Amp) Last DGA (GR & TFP) checked on dt. 06.01.16 during IC sch. & found normal. QLM relay make AAL. Mfg year 2014. last calibrated on 06.01.16 during IC. Setting found normal (9.0 Amp). CHT terrute also checked found normal.

405

191

31521

SER

TATA

3-Phase

WAG9

13-Aug-14

CLW

29-Feb-16

Brake system (E-70/Knorr)

Heavy air leakage from cab-1 emergency valve and BP not creating.

During checking it was found that iron ore particles got inserted inside BPCP and NB-11 valve both. Iron ore removed and both valve cleaned.

565

192

31596

ECR

GMO

3-Phase

WAG9

08-Aug-15

CLW

29-Feb-16

Brake system (E-70/Knorr)

PBU-7 not released. Equip./ Make - FTRIL

Attended at TATA by firm.

205

193

31495

ECoR

WAT

3-Phase

WAG9

20-Jul-14

CLW

28-Feb-16

Aux. converter IGBT (BUR)

Batter voltage showing too low while BUR-2 in service and over heating of BUR-2 indicator, Fail equipment: BUR-2, S.No.64

BUR-2 inductor and registrations found with software version 183, software updated with version 985.5 in all the BURs to rectify Firm representative . Loco tested found working normal on 29/01/16

588

194

31537

SER

TATA

3-Phase

WAG9

18-Dec-14

CLW

28-Feb-16

Brake system (E-70/Knorr)

Heavy air leakage from CCB panel.

During checking it was observed that air leakage had been occurred from BPCP module of CCB. On further action it was found that one coal piece of size 8mm got inserted into the BPCP. Same removed and cleaned BPCP was refitted.

437

195

31664

WR

BRC

3-Phase

WAG9

26-Nov-15

CLW

26-Feb-16

Gear case

Metal content(1.38 grams) found In G/case no- 5

Loco lifted and attended.

92

196

31657

SER

TATA

3-Phase

WAG9

25-Aug-15

CLW

23-Feb-16

Aux. converter IGBT (BUR)

Both OCB not working.

On checking found BUR-1 (BHEL make) inverter module defective same changed and warranty claimed.

182

197

31622

ECoR

WAT

3-Phase

WAG9

10-Jun-15

CLW

23-Feb-16

Central Electronics

While BL is ‘ON’, display was showing life sign missing from BUR1, 2, 3. Fatal error and main power off. Fail equipment : VCU, Sl.No. 1502515, Make: CGL

Letter to M/s. Crompton Greaves Limited, Mandideep 462 046, Bhopal, Madhya Pradesh and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/712, Dt. 05-03-16

258

198

28656

ECoR

ANGL

Conventional

WAG7

28-Mar-14

CLW

22-Feb-16

Transformer

1. Loco no-28656 failed on dt-22.02.16 at ADTP station of CKP divn./SER. LP reported that the safety valve of the TFP of the loco is blown out and the TFP oil is splashed near HT compartment. On checking the relay panel no safety relay found dropped. 2. Loco arrived at ELS/ANGL on dt-03.03.16 as dead condition. 3. Firm staff of M/s-Hirect arrived at shed on dt-08.03.16. The TFP of the loco is jointly checked and the following observations are made: (i) Safety valve of the TFP is in blown out condition and TFP oil is splashed around the TFP.TFP oil is also found accumulated in oil trap chamber. (ii) From MPCS data it is confirmed that QLM relay was not dropped at the time of failure. (iii) DGA of the TFP oil is carried out and the volume of concentrated gases found increased abnormally as following; Item PPM Value Item PPM value Methane 185.559 Ethylene 70.172 Ethane 1055.33 Acetylene 769.024 Hydrogen 477.807 CO 131.861 4. Connections of TFP bushing found properly connected & no abnormality noticed. QLM relay is also checked in test bench & found working normal and the QLM circuit continuity also checked & found normal. 5. The Value of Voltage Ratio Test is carried out with a Supply Voltage of 230 Volt 1-Ø AC. It is observed that the voltage across the a3-a4 & a5-a6 bushing drops abnormally. 6. The IR value measurement carried out & the following values are found ok. Between Terminals Standard Value as per the Rly. Actual value in MΩ A0-A33-A34 To E >100 MΩ 700 a0-a1 To E 1000 a7-a8 To E 700 a3 –a4 To E 1000 a5-a6 To E 1000 A0-A33-A34 To a3 –a4 1000 A0-A33-A34 To a5-a6 1000 A0-A33-A34 To a0-a1 1000 a0-a1 To a3 –a4 1000 a7-a8 To a5 –a6 300 a3 –a4 To a5 –a6 800 7. The GR assembly was removed from the TFP. The leads of TFP at Oil Trap chamber are visually checked. No abnormality observed, however oil is blackish in colour.

Remarks of ELS/ANGL: i. As per the test carried out & result obtained, it is suspected some kind of internal flashing in auto winding of the TFP. ii. As the TFP is under warranty , so, Warranty of the main transformer has already been claimed vide letter no.ELS/ANGL/S-59/16/554/1125, Dtd. 03.03.2016 & uploaded in WFMS(Warranty Failure Management Syst em) Portal.(Copy enclosed) iii. Hence, firm is advised to carry out the repairing of the Transformer at firm premises as early as possible to avoid loco detention on Transformer account.

696

199

28659

NCR

JHS

Conventional

WAG7

29-Apr-14

CLW

22-Feb-16

Miscellaneous

Train stopped KMS DN main line at 4:45 for line clear. Loco tripped in standing position and message given low/No OHE voltage. LP talk with CLI B.Jha at 5:25 then BLRDJ pressed still LSCHBA not extinguish. Found DJ hold, gave ready at 5:30. LP closed BLVMT & BLCP but after 6th notch loco tripped again . Loco made dead for 5 minutes then energised found loco normal, gave ready at 6:45, left- 7:00.

Loco checked by LP and BA off for 5 minutes then energised & loco working normal. Loco checked in shed on dt. 08.03.16 during major sch. & found normal. DJ pressure checked also & found normal (5.2 kg/cm2). FDCS data downloaded & analysed. No trouble noticed in FDCS data. FDCS make ICE

664

200

30087

WR

BRC

3-Phase

WAP5

01-Dec-15

CLW

21-Feb-16

Miscellaneous

cab-1 AFI gauge glass broken. Make: Midland, DOC: 24.11.15, Sr. No. P-121-05/14, P3304-5/14, provided by CLW

same replaced

82

201

30446

NR

GZB

3-Phase

WAP7

04-Feb-16

CLW

20-Feb-16

Traction converter IGBT (SR)

Main power off

Fibre optic cable from PEC INT-2 to MC-2V both CD card not transmitted Signals

16

202

30098

NR

GZB

3-Phase

WAP5

20-Feb-16

CLW

20-Feb-16

Miscellaneous

• Loco having following improper mechanical clearances. a) Cattle guard nose height- 132mm ( limit-132- 170mm) b) Cab1 buffer projection :-640 mm ( minimum limit is 645mm) c) Gear Case no 1 Hurth coupling having excessive play.

Attended

0

203

25018

WR

BRC

Conventional

WAP4

22-Jun-15

CLW

18-Feb-16

Battery Charger (CHBA)

At BA ON position, battery voltage was recorded 94 volt, on closing DJ, BA voltage was not increasing, CHBA ampere meter showing in –ve side) and loco got shut down, when BA was made to zero while DJ was closed and SIV ‘ON’ condition.On further detail checking it was noticed that K-8 contactor of CHBA was not passing feed

As per Firm K-8 contactor have to by passed in all 06 newly commissioned loco.

241

204

25018

WR

BRC

Conventional

WAP4

22-Jun-15

CLW

18-Feb-16

SIV

K-8 contactor of CHBA was not passing feed (Connected of the output of CHBA (-ve) side. CHBA details: Make Siemens SIV; Sr. No. STB11W0919, DOC: 22.06.15

To avoid the failure of CHBA due to K8 contactor malfunction, K8 contactor was bypassed by connecting –ve of battery at SB terminals with color coding to avoid reverse polarity. A letter is written to HQ for informing RDSO/OEM to provided solution of the problem of K-8 contactor in M/s Siemens make 180 KVA SIV equipped with KRF CHBA in Newly commissioned locos vide letter no. TRS/BRCY /T/31A dtd. 17.02.16

241

205

31636

WR

BRC

3-Phase

WAG9

26-Nov-15

CLW

17-Feb-16

Gear case

metal content(2.4 Grams) found In G/case no- 3

Loco lifted and attended.

83

206

25045

ECoR

WAT

Conventional

WAP4

11-Nov-15

CLW

16-Feb-16

Miscellaneous

DC – DC converter both input & output switches were defective. Fail equipment:DC-DC converter, Sl.No.14061675, Make: Signotron

Letter to M/s Signotron (India) Pvt Ltd, Kolkata-700091 for early attention vide lt No. WAT/TRS/T/32C/710, Dt. 07-03-16

97

207

28752

WR

BL

Conventional

WAG7

10-Jul-15

CLW

16-Feb-16

Control Circuit

WHEN ANY TWO CP WORKING THEN MESSEG CP-2 FEED BACK FAIL. MEDHA MPCS INPUT CARD NO 2 & 8 DEFECTIVE U/W , MEDHA

 

221

208

31578

ECoR

WAT

3-Phase

WAG9

20-Jan-16

CLW

15-Feb-16

TM/MR Scavenge motor

During inspection, it is found MRB-2 not working due to inductance value is low. Fail equipment: SScavenger Blower MRB-2,Sl No. CF25/D2127, Make:Samal Harand.

Letter to M/s. Samal Harand of Indian Pvt., Ltd., Kolkata- 700 071 and CEE/Loco/CLW for early attention of warranty, vide letter No. WAT/TRS/T/32C/501, Dt. 17-02-16

26

209

30081

WR

BRC

3-Phase

WAP5

31-May-15

CLW

14-Feb-16

Traction converter IGBT (SR)

Line converter 1 of Traction Converter 1 got isolated due to fault messages “TC1:0076 LC 1 isolated, TC1:0083 Disturbance communication PEC Int 1-LC1U_GD” Hence loco was called dead to ELS BRC for detailed checking and same informed to firm M/s ABB for taking necessary action. Fault data was taken by firm representative and sent to M/s ABB Bangalore. Following fault messages were found logged: TC1:0076 LC 1 isolated TC1:0083 Disturbance communication PEC Int 1-LC1U_GD
1   ...   5   6   7   8   9   10   11   12   ...   179

Related:

No of days after Commissioning iconKitiara, of all the days these days are locked in dark and waiting,...

No of days after Commissioning iconClinical commissioning group

No of days after Commissioning iconProfile Instrument Technician (Pre-Commissioning)

No of days after Commissioning iconFor supply, Installation, Testing and Commissioning of 33/11 kv external Electrification

No of days after Commissioning iconSupply installation testing & commissioning of air conditioners at peroorkada factory

No of days after Commissioning iconSub : Tender enquiry for Supply, Installation and Commissioning of...

No of days after Commissioning iconHave Varied Experience of in Project/ Routine Maintenance, Installation,...

No of days after Commissioning iconSenior level managerial assignments a Installation and Commissioning...

No of days after Commissioning iconNinety Days, Same As Cash

No of days after Commissioning iconSupply, Installation, Testing and Commissioning of 2 X 700 tr central...

No of days after Commissioning iconWeek Two Meal Planner 7 days for 2 adults

No of days after Commissioning iconWeek One Meal Planner 7 days for 2 adults

No of days after Commissioning iconWeek Three Meal Planner 7 days for 2 adults

No of days after Commissioning iconThe Days were a clan that mighta lived long

No of days after Commissioning iconOver 5,200 visitors: Arburg Technology Days 2011 sets new record

No of days after Commissioning iconWell here I am again. For some time now I am more calm and relaxed...

No of days after Commissioning icon“It takes eleven days to go from Horeb to Kadesh Barnea by the Mount Seir road.”

No of days after Commissioning iconUser Login Time (local): 12/31/2016 09: 49: 01 (4 days, 4 hours, 21 mins ago)

No of days after Commissioning iconExhibits and specialist presentations shed light on production efficiency at the Technology Days

No of days after Commissioning iconCroatia’s largest shopping centre is opening on 12 November with...




manual


When copying material provide a link © 2017
contacts
manual-guide.com
search