General summary




Download 197.86 Kb.
NameGeneral summary
page2/5
A typeDocumentation
manual-guide.com > manual > Documentation
1   2   3   4   5

ENVIRONMENTAL CONDITIONS


The UPS shall be able to withstand the following environmental conditions without damage or degradation of operating characteristics:

  1. Operating Ambient Temperature

  • UPS: 32°F to 104°F (0°C to 40°C) for up to 8 hours without derating; up to 95°F (35°C ) continuously without derating

  • Battery: 77°F (25°C), ±5°F (±3°C)

  1. Storage/Transport Ambient Temperature

  • -4°F to 158°F (-20°C to 70°C)

  1. Relative Humidity

  • 0 to 95%, non-condensing

  1. Altitude

  • Operating: To 3300 ft. (1000m) above Mean Sea Level without derating (compliant with IEC/EN 62040‑3 at altitudes exceeding 1000m)

Consult factory for derating above 3300 ft. (1500m) elevation.

  • Storage/Transport: To 50,000 ft. (15,000m) above Mean Sea Level

  1. Audible Noise Level

  • 70dBA measured 5 ft. (1.5m) from the surface of the unit
    1. SUBMITTALS

      1. Proposal Submittals


Submittals with the proposal shall include:

  • Descriptions of equipment to be furnished, including deviations from these specifications.

  • Document stating compliance with FCC requirements.

  • Document stating listing to UL, including edition used for listing.

  • Document showing compliance with required SCCR and labeling.

  • System configuration with single-line diagrams.

  • Detailed layouts of customer power and control connections.

  • Functional relationship of equipment, including weights, dimensions and heat dissipation.

  • Information to allow distribution system coordination.

  • Size and weight of shipping units to be handled by contractor.
      1. Order Submittals


Submittals produced for the order shall include:

  • All of the documentation presented with the proposal, per Section 1.5.1 above.

  • Detailed installation drawings including all terminal locations.

  • Interconnect wiring diagrams showing conduit wiring with terminal numbers for each wire.


      1. UPS Delivery Submittals


Submittals upon UPS delivery shall include:

  • A complete set of submittal drawings.

  • Two sets of instruction manuals. Manuals shall include a functional description of the equipment, safety precautions, instructions, step-by-step operating procedures and routine maintenance guidelines, including illustrations.
    1. WARRANTY

      1. UPS Warranty


The UPS manufacturer shall warrant the unit against defects in workmanship and materials for 12 months after initial startup or 18 months after the shipping date, whichever comes first.
      1. Warranty - End User


Warranties associated with items not manufactured by the UPS supplier but included as part of the system shall be passed through to the end user.
    1. QUALITY ASSURANCE

      1. Manufacturer’s Qualifications


A minimum of 20 years’ experience in the design, manufacture and testing of solid-state UPS systems shall be required.

The quality system for the engineering and manufacturing facility shall be certified to conform to Quality System Standard ISO 9001 for the design and manufacture of power protection systems for computers and other sensitive electronics.
      1. Factory Testing


Before shipment, the manufacturer shall fully and completely test the UPS unit to ensure compliance with the specification.

The UPS unit shall be tested at the system-specified capacity. Testing shall be done using load banks at part-load and the full kW rating of the unit.

Operational discharge and recharge tests to ensure guaranteed rated performance.

System operations such as startup, shutdown and transfers shall be demonstrated.

A certified copy of test results shall be available for each system as indicated on the order.
1   2   3   4   5

Related:

General summary iconGeneral Summary

General summary iconGeneral summary

General summary icon1. 0 general 1 summary

General summary iconGeneral summary

General summary iconGeneral summary

General summary iconGeneral summary

General summary iconGeneral summary

General summary iconGeneral summary

General summary iconGeneral summary

General summary iconGeneral 1 summary

General summary iconGeneral summary

General summary iconGeneral summary

General summary iconPart 1 General 01 Summary

General summary iconPart 1 general summary section Includes

General summary iconGeneral conditons related documents drawings and general provisions...

General summary iconI. general a. Related documents drawings and general provisions of...

General summary iconVolume I compilation of general comments and general recommendations...

General summary iconA. Drawings and general provisions of the Contract, including General...

General summary iconDrawings and general provisions of the Contract, including General...

General summary iconDrawings and general provisions of the Contract, including General...




manual




When copying material provide a link © 2017
contacts
manual-guide.com
search